TENAGA NASIONAL BHD

KLSE: 5347 (TENAGA)

Kemas kini terakhir: 7 minit lalu

13.16

0.04 (0.30%)

Penutupan Terdahulu 13.12
Buka 13.24
Jumlah Dagangan 3,186,900
Purata Dagangan (3B) 6,798,683
Modal Pasaran 76,498,419,712
Harga / Pendapatan (P/E TTM) 16.25
Harga / Pendapatan (P/E Ke hadapan) 16.69
Harga / Jualan (P/S) 1.38
Harga / Buku (P/B) 1.30
Julat 52 Minggu
11.30 (-14%) — 15.24 (15%)
Tarikh Pendapatan 29 May 2025 - 2 Jun 2025
Hasil Dividen (DY TTM) 3.88%
Margin Keuntungan 7.14%
Margin Operasi (TTM) 17.64%
EPS Cair (TTM) 0.810
Pertumbuhan Hasil Suku Tahunan (YOY) 2.20%
Pertumbuhan Pendapatan Suku Tahunan (YOY) 63.50%
Jumlah Hutang/Ekuiti (D/E MRQ) 137.79%
Nisbah Semasa (MRQ) 1.19
Aliran Tunai Operasi (OCF TTM) 22.45 B
Aliran Tunai Bebas Leveraj (LFCF TTM) 4.22 B
Pulangan Atas Aset (ROA TTM) 2.66%
Pulangan Atas Ekuiti (ROE TTM) 7.65%

Arah Aliran Pasaran

Jangka Pendek Jangka Sederhana
Industri Utilities - Regulated Electric (MY) Bercampur Bercampur
Utilities - Regulated Electric (Global) Bercampur Menaik
Stok TENAGA Menurun Menaik

AISkor Stockmoo

0.7
Konsensus Penganalisis 1.5
Aktiviti Orang Dalam 3.0
Volatiliti Harga 1.0
Purata Bergerak Teknikal -1.5
Osilator Teknikal -0.5
Purata 0.70

Saham Serupa

Stok Modal Pasaran DY P/E (TTM) P/B
TENAGA 76 B 3.88% 16.25 1.30
MFCB 4 B 2.38% 7.73 1.14

Tenaga Nasional Bhd, or TNB, is an electric utility company in Malaysia. The company is involved in the generation, transmission, distribution, and sale of electricity. TNB segments its operations into a generation division, a transmission division, and a distribution division. The generation division encompasses the company's portfolio of thermal and hydroelectric power plants located throughout Malaysia. Through its subsidiaries, TNB also engages in other energy-related operations, such as the manufacturing of transformers and the providing of consulting services. The company generates revenue through the sale of electricity in West Malaysia. Its customers are mainly commercial operations, domestic consumers, and large industrial entities.

Sektor Utilities
Industri Utilities - Regulated Electric
Gaya Pelaburan Large Value
% Dimiliki oleh Orang Dalam 0.33%
% Dimiliki oleh Institusi 81.17%
17.4117.4115.5615.5613.7213.7211.8711.8710.0210.02Harga Sasaran MedianQ3 '22Q3 '22Q4 '22Q4 '22Q1 '23Q1 '23Q2 '23Q2 '23Q3 '23Q3 '23Q4 '23Q4 '23Q1 '24Q1 '24Q2 '24Q2 '24Q3 '24Q3 '24Q4 '24Q4 '24Q1 '25Q1 '25
Julat 52 Minggu
11.30 (-14%) — 15.24 (15%)
Julat Harga Sasaran
12.60 (-4%) — 17.84 (35%)
Tinggi 17.84 (BIMB, 35.56%) Beli
Median 15.75 (19.68%)
Rendah 12.60 (AmInvest, -4.26%) Jual
Purata 15.79 (19.99%)
Jumlah 5 Beli, 1 Jual
Harga Purata @ Panggilan 13.62
Syarikat Tarikh Harga Sasaran Panggilan Harga @ Panggilan
RHB-OSK 14 Mar 2025 15.50 (17.78%) Beli 13.40
14 Jan 2025 16.60 (26.14%) Beli 13.82
BIMB 10 Mar 2025 17.84 (35.56%) Beli 13.54
AmInvest 03 Mar 2025 12.60 (-4.26%) Jual 13.70
PUBLIC BANK 03 Mar 2025 16.00 (21.58%) Beli 13.70
RHB 03 Mar 2025 15.50 (17.78%) Beli 13.70
TA 03 Mar 2025 17.30 (31.46%) Beli 13.70
Nama Purata Belian ($) Purata Jualan ($) Jumlah Net Jumlah Nilai Bersih ($)
EMPLOYEES PROVIDENT FUND BOARD 13.58 13.56 5,434,700 73,930,286
Jumlah Keseluruhan Kuantiti Bersih 5,434,700
Jumlah Keseluruhan Nilai Bersih ($) 73,930,286
Purata Pembelian Keseluruhan ($) 13.58
Purata Jualan Keseluruhan ($) 13.56
Nama Pemegang Tarikh Jenis Kuantiti Harga Nilai ($)
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 27 Mar 2025 Dibuang (-) 2,141,000 13.56 29,031,960
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 27 Mar 2025 Diperolehi (+) 780,400 13.56 10,582,224
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 27 Mar 2025 Diperolehi (+) 7,600 13.56 103,056
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 26 Mar 2025 Diperolehi (+) 1,787,700 13.58 24,276,966
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 25 Mar 2025 Diperolehi (+) 3,000,000 13.60 40,800,000
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 25 Mar 2025 Diperolehi (+) 2,000,000 13.60 27,200,000
Tarikh Jenis Butiran
07 Apr 2025 TheEdge Petronas to build regasification terminal in Lumut, third in Malaysia, say sources
05 Apr 2025 TheEdge Police probe into Putra Heights fire to focus on negligence, criminal elements
04 Apr 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Apr 2025 TheEdge TNB announces 100% electricity bill rebate for Putra Heights fire victims
03 Apr 2025 TheEdge Cover Story: Companies that paid the most to Malaysia’s GLICs in 2024
03 Apr 2025 TheEdge Mayu Global, Tuju Setia, Iskandar Waterfront City, TNB, HHRG
03 Apr 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Apr 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
01 Apr 2025 TheEdge Gas pipeline blaze: Power supply fully restored in Subang Jaya — TNB
01 Apr 2025 TheSun MN Holdings 2025 prospects positive, backed by record high order book: HLIB Research
01 Apr 2025 TheSun MN Holdings 2025 prospects strong, backed by record high order book: HLIB Research
28 Mar 2025 TheEdge MN Holdings bags its largest direct contract of RM138m from TNB
28 Mar 2025 TheEdge Energy Commission introduces CREAM guidelines, expanding green energy options
28 Mar 2025 TheEdge MN Holdings, Genting, MMAG, LSH Capital, Able Global, Kerjaya Prospek Property, Yinson, GUH Holdings, DNeX and Sarawak Cable
28 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
27 Mar 2025 TheEdge Jati Tinggi wins RM48 mil job from TNB
27 Mar 2025 TheEdge Sapura Energy, Jati Tinggi, Keyfield, Bursa Malaysia, KPJ, Al-Aqar REIT, LSH Capital, HHRG, Cypark, Crescendo, Malakoff
27 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
26 Mar 2025 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
26 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
26 Mar 2025 TheEdge Rohas Tecnic bags RM93m transmission line contract from TNB
26 Mar 2025 TheEdge LSH Capital, Matrix Concepts, Symphony Life, Gamuda, Gas Malaysia, Kim Loong, United Malacca, MyNews, Marine & General, Dayang, Nestcon, Solarvest, Rohas Tecnic, Bintai Kinden
25 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
25 Mar 2025 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
24 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
24 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Mar 2025 TheEdge Powering progress: How TNB is fuelling Malaysia’s EV revolution
21 Mar 2025 Pengumuman Changes in Director's Interest (Section 219 of CA 2016) - DATUK IR MEGAT JALALUDDIN BIN MEGAT HASSAN
21 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
21 Mar 2025 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
21 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 Mar 2025 TheEdge Samaiden, Solarvest, Poh Kong, Affin, Eco World International, ITMAX, Lim Seong Hai Capital, Gagasan Nadi Cergas, NCT Alliance, YTL Power, Heitech Padu, IGB Commercial REIT, IGB REIT, Favelle Favco, Sapura Industrial, TSR Capital
20 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
19 Mar 2025 TheEdge Solarvest signs large-scale solar power purchase agreement with TNB
19 Mar 2025 TheEdge Sabah’s high-stakes electricity overhaul
19 Mar 2025 TheEdge PM sets target for 500 schools to be adopted by corporate and govt-linked companies
19 Mar 2025 TheEdge Samaiden signs 21-year agreement with TNB for LSS5 solar project
19 Mar 2025 TheEdge Solarvest bucks broader market decline as analysts, investors cheer contract win
19 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
19 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Mar 2025 TheEdge Apex Securities says KLCI valuation is now attractive, but sees little upside amid external risks
17 Mar 2025 TheEdge MRCB, Sapura Energy, Solarvest, Salcon, Rohas Tecnic, HHRG, Jentayu, Focus Point, Catcha Digital, Poh Huat, Dutch Lady, AmanahRaya REIT
17 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
17 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
17 Mar 2025 TheEdge REITs and banks outperform FBM KLCI amid market volatility
14 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
14 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
13 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
13 Mar 2025 Pengumuman TENAGA - Notice of Book Closure
13 Mar 2025 TheEdge Penang to have 600 EV charging bays by year end
12 Mar 2025 Pengumuman Final Dividend
12 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
11 Mar 2025 TheEdge ES Sunlogy secures RM34m contract for 29.99MWac solar project
11 Mar 2025 Pengumuman Changes in Director's Interest (Section 219 of CA 2016) - DATUK IR MEGAT JALALUDDIN BIN MEGAT HASSAN
11 Mar 2025 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
11 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
07 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
07 Mar 2025 TheEdge MN Holdings bags RM58.2 mil substation contract from TNB
07 Mar 2025 TheEdge Local institutional funds on buying spree after heavy market sell-off
07 Mar 2025 TheEdge Capital A, Bumi Armada, SNS Network, MN Holdings, TNB, Econpile, Swift Energy, UEM Edgenta, Northeast, WTK
06 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
06 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Mar 2025 TheEdge Analysts cut FBM KLCI valuation, year-end target on weak outlook
05 Mar 2025 TheEdge Generator rental firm Express Powerr files draft prospectus for ACE Market IPO
04 Mar 2025 TheEdge Tenaga confident of getting 60%-70% of contingent capex approved — analysts
04 Mar 2025 TheEdge Government recognition of steel industry as a strategic sector is a game changer, says Misif
04 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Mar 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
01 Mar 2025 TheEdge CIMB, TNB, Allianz Malaysia, PPB, KPJ Healthcare, Pharmaniaga, Capital A, AirAsia X, Batu Kawan, KLK, S P Setia, Tropicana, FGV, Farm Fresh, Unisem, PIE Industrial, Cape EMS, Guan Chong, Inta Bina
01 Mar 2025 TheEdge TNB’s Manjung 4 power plant back online after a year
28 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
28 Feb 2025 TheEdge TNB to pay out four-year high dividend for FY2024
28 Feb 2025 Pengumuman Quarterly rpt on consolidated results for the financial period ended 31/12/2024
27 Feb 2025 TheEdge TNB board approves two-year extension for Abdul Razak as chairman
27 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
27 Feb 2025 TheEdge Cover Story: PNB tackling uphill battle of getting Malaysians to save
27 Feb 2025 TheEdge McDonald’s Malaysia partners with Indah Water Konsortium for grease trap desludging services
26 Feb 2025 TheEdge Broga land deal followed procedure, no losses incurred, says PKNS
26 Feb 2025 TheEdge Nestlé (Malaysia), Affin Bank, TM, IOI Corp, Padini, ITMAX, Leong Hup, AEON Co, Frontken, Pentamaster, Keyfield, Pekat, TNB, NEXG
26 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
26 Feb 2025 Pengumuman EXTENSION OF SERVICE OF TENAGA NASIONAL BERHAD'S NON-INDEPENDENT NON-EXECUTIVE CHAIRMAN
25 Feb 2025 TheEdge Plantation ministry plans to collaborate with Energy Commission and TNB to integrate palm oil-based RE into national grid
25 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
23 Feb 2025 TheSun Malakoff stages turnaround in FY24 with RM268.69 million net profit
21 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 Feb 2025 TheEdge Khazanah among world’s best-performing sovereign wealth funds in 2024
19 Feb 2025 TheEdge Southern Cable bags RM403.6m underground cable supply job from TNB
19 Feb 2025 TheEdge MPI, Perdana Petroleum, Southern Acids, Malaysia Marine and Heavy Engineering, Duopharma Biotech, ITMAX System, Southern Cable, Salcon, EA Technique, Hektar REIT and MQ Tech
19 Feb 2025 TheEdge Fadillah: Govt reviewing electricity tariff adjustment for Kulim Hi-Tech Park to align with scheduled Peninsular Malaysia hike
19 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Feb 2025 Pengumuman DEVELOPMENT ON THE NOTICES OF ADDITIONAL ASSESSMENT FOR THE YEARS OF ASSESSMENT 2015 TO 2017 RECEIVED FROM INLAND REVENUE BOARD OF MALAYSIA
18 Feb 2025 Pengumuman DEVELOPMENT ON THE NOTICES OF ADDITIONAL ASSESSMENT FOR THE YEARS OF ASSESSMENT 2020 TO 2021 RECEIVED FROM INLAND REVENUE BOARD OF MALAYSIA
18 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Feb 2025 TheEdge Govt rules out Johor power plant, focuses on grid upgrades to meet demand — deputy minister
16 Feb 2025 TheSun Master Tec secures RM107.75m contract to supply underground cables, conductors to TNB
14 Feb 2025 TheEdge Power station fire: TNB works on inspection, recovery
14 Feb 2025 TheEdge Master Tec wins TNB supply contract worth RM108m
14 Feb 2025 TheEdge Operations at Tuanku Jaafar power plant back to normal — TNB
14 Feb 2025 TheEdge LPI Capital, EA Technique, CPE Technology, M&G, Master Tec, Maxis, MNRB, MAHB, Able Global, YBS, Waja Konsortium
14 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Feb 2025 TheSun Malaysia well-equipped to meet power needs of data centres, says TNB president/CEO
13 Feb 2025 TheEdge Cover Story 1: Twists in the AI race
12 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 Feb 2025 TheEdge SKN Land fails to terminate winding up of Crest Worldwide
10 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
07 Feb 2025 TheEdge The bright future of solar energy
07 Feb 2025 TheEdge Kinergy Advancement ventures into independent power producer sector via RM35 mil acquisition
07 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
06 Feb 2025 TheEdge CRESS scheme helps consumers access green electricity, attract foreign investments, says Fadillah
06 Feb 2025 TheEdge MN Holdings calls off cybersecurity projects MOU after failing to secure contracts
06 Feb 2025 TheEdge TNB suspends second helicopter operations following Bentong crash
06 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Feb 2025 TheEdge January 2025 worst for Malaysian stocks in 30 years, February historically positive, says CIMB
05 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
05 Feb 2025 Pengumuman DEVELOPMENT ON THE NOTICE OF ADDITIONAL ASSESSMENT FOR THE YEAR OF ASSESSMENT 2018 RECEIVED FROM INLAND REVENUE BOARD OF MALAYSIA
04 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
04 Feb 2025 TheEdge Brokers Digest: Local Equities - Hartalega Holdings Bhd, Pekat Group Bhd, PGF Capital Bhd, Genting Malaysia Bhd
03 Feb 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Feb 2025 TheSun ACCCIM cautiously optimistic on economic, business prospects for 2025
31 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
29 Jan 2025 TheEdge Decoding Malaysia’s new electricity tariff plan
28 Jan 2025 TheEdge MAHB, TH Plantations, Salcon, Kinergy Advancement, Datasonic, EVD, Key Alliance, Taghill, Malakoff, Eonmetall and Ecobuilt
28 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
28 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
27 Jan 2025 TheEdge ES Sunlogy eyes LSS5+ to expand solar farm portfolio
27 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
27 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
27 Jan 2025 TheEdge Engineering firm ES Sunlogy launches ACE Market IPO prospectus, aims to raise RM63m
27 Jan 2025 TheEdge No lucky escape for Bursa AI proxies from DeepSeek-triggered selldown
24 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
24 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
23 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
22 Jan 2025 TheEdge Construction of ECRL in Terengganu fastest, achieves 90% completion — Ahmad Samsuri
22 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
22 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
21 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
21 Jan 2025 Pengumuman DEVELOPMENT ON THE NOTICES OF ADDITIONAL ASSESSMENT FOR THE YEARS OF ASSESSMENT 2015 TO 2017 RECEIVED FROM INLAND REVENUE BOARD OF MALAYSIA
21 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
20 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
20 Jan 2025 Pengumuman WINDING UP / RECEIVER & MANAGER / RESTRAINING ORDER / SPECIAL ADMINISTRATOR
20 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
20 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
20 Jan 2025 TheEdge MAHB, 7-Eleven, Fajarbaru, Datasonic, Scanwolf, UUE, SkyWorld, Mieco, Maxland
20 Jan 2025 TheEdge UUE secures RM27.5m in contract renewals, boosting total 2025 contract wins to RM64m
20 Jan 2025 TheEdge Better days ahead for beaten-down big caps on Bursa
18 Jan 2025 TheEdge PM's UK visit attracts potential investments worth RM11b
17 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
17 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Jan 2025 TheEdge Malaysia back on EM investors’ radar on data centre play, and as Johor story is 'finally happening', says Jefferies
17 Jan 2025 TheEdge Anwar: TNB’s UK venture in RE to benefit Malaysia in tech transfer
17 Jan 2025 TheEdge Anwar launches TNB’s renewable energy ventures in UK
17 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
16 Jan 2025 TheEdge Jati Tinggi bags RM25.5 mil job from TNB to lay cables for data centre
16 Jan 2025 TheEdge Data-centre proxy stocks decline; experts warn against early bottom fishing
16 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
16 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
16 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
15 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Jan 2025 TheEdge Thematic Play: Data centre a new theme that gathers steam
14 Jan 2025 TheEdge 2024 Newsmakers: Running the show
14 Jan 2025 TheEdge Risks to economic growth tilt more to downside as Trump 2.0 uncertainties loom, says Maybank IB
14 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
14 Jan 2025 TheEdge Gamuda, Yinson, YTL Power, Eden, Infomina, Kimlun, Solarvest, Sapura Energy, Apex Equity
14 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - AMANAHRAYA TRUSTEES BERHAD - AMANAH SAHAM BUMIPUTERA
13 Jan 2025 TheEdge Stories Of The Year: Can Malaysia capitalise on its data centre ambitions?
13 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - KUMPULAN WANG PERSARAAN (DIPERBADANKAN)
13 Jan 2025 TheEdge YTL Power ‘confident’ not affected by US chip export curbs amid Nvidia partnership
13 Jan 2025 TheEdge Eden picked to develop 29.99MW solar plant in Kuantan
10 Jan 2025 TheEdge TNB, Berjaya Corp, Sime Darby Property, Uzma, Metronic, Kumpulan Perangsang Selangor, Key Alliance
10 Jan 2025 TheEdge 2025 outlook: The key sectors to watch
10 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Jan 2025 TheEdge IRB slaps TNB unit with RM292m tax bill
10 Jan 2025 Pengumuman NOTICE OF ASSESSMENT RECEIVED FROM INLAND REVENUE BOARD OF MALAYSIA BY TNB WESTERN ENERGY BERHAD
09 Jan 2025 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
09 Jan 2025 TheEdge TNB: Data centres 'best customers' for infrastructure investment
09 Jan 2025 TheEdge EVENING 5: Five things you need to know today
Papar semua
Hasil Dividen (DY TTM) 3.88%
Purata Hasil Dividen 5T 5.85%
Nisbah Pembayaran 65.58%
Jangkaan Pembayaran Dividen Seterusnya Oct 2025
Tarikh EX Tarikh Pengumuman Tarikh Pembayaran Perincian
27 Mar 2025 12 Mar 2025 16 Apr 2025 0.26 Tunai
27 Sep 2024 11 Sep 2024 17 Oct 2024 0.25 Tunai
27 Mar 2024 11 Mar 2024 18 Apr 2024 0.28 Tunai
27 Sep 2023 12 Sep 2023 17 Oct 2023 0.18 Tunai
30 Mar 2023 15 Mar 2023 14 Apr 2023 0.26 Tunai
29 Sep 2022 13 Sep 2022 14 Oct 2022 0.2 Tunai
30 Mar 2022 15 Mar 2022 15 Apr 2022 0.18 Tunai
29 Sep 2021 09 Sep 2021 15 Oct 2021 0.22 Tunai
30 Mar 2021 15 Mar 2021 16 Apr 2021 0.18 Tunai
30 Mar 2021 15 Mar 2021 16 Apr 2021 0.4 Tunai
29 Sep 2020 10 Sep 2020 14 Oct 2020 0.22 Tunai
30 Mar 2020 12 Mar 2020 16 Apr 2020 0.5 Tunai
30 Mar 2020 12 Mar 2020 16 Apr 2020 0.2 Tunai
27 Sep 2019 10 Sep 2019 11 Oct 2019 0.3 Tunai
27 Mar 2019 13 Mar 2019 11 Apr 2019 0.23 Tunai
26 Sep 2018 06 Sep 2018 11 Oct 2018 0.3027 Tunai
04 Apr 2018 19 Mar 2018 19 Apr 2018 0.2141 Tunai
19 Dec 2017 20 Nov 2017 29 Dec 2017 0.44 Tunai
18 May 2017 03 May 2017 31 May 2017 0.17 Tunai
16 Dec 2016 17 Nov 2016 30 Dec 2016 0.22 Tunai
18 May 2016 03 May 2016 31 May 2016 0.1 Tunai
15 Dec 2015 19 Nov 2015 31 Dec 2015 0.19 Tunai
18 May 2015 30 Apr 2015 29 May 2015 0.1 Tunai
17 Dec 2014 20 Nov 2014 31 Dec 2014 0.19 Tunai
15 May 2014 29 Apr 2014 29 May 2014 0.1 Tunai
18 Dec 2013 20 Nov 2013 31 Dec 2013 0.15 Tunai
15 May 2013 25 Apr 2013 29 May 2013 0.1 Tunai
17 Dec 2012 22 Nov 2012 28 Dec 2012 0.15 Tunai
14 May 2012 26 Apr 2012 25 May 2012 0.0509 Tunai
12 May 2011 27 Apr 2011 27 May 2011 0.045 Tunai
14 Dec 2010 18 Nov 2010 30 Dec 2010 0.2 Tunai
13 May 2010 28 Apr 2010 27 May 2010 0.06 Tunai
14 Dec 2009 17 Nov 2009 24 Dec 2009 0.123 Tunai
11 May 2009 28 Apr 2009 22 May 2009 0.04 Tunai
10 Dec 2008 26 Nov 2008 23 Dec 2008 0.1 Tunai
15 May 2008 02 May 2008 29 May 2008 0.1 Tunai
13 Dec 2007 30 Nov 2007 03 Jan 2008 0.163 Tunai
17 Aug 2007 06 Aug 2007 30 Aug 2007 0.1 Tunai
28 May 2007 15 May 2007 07 Jun 2007 0.1 Tunai
13 Dec 2006 01 Dec 2006 04 Jan 2007 0.14 Tunai
14 Dec 2005 05 Dec 2005 10 Jan 2006 0.12 Tunai
24 Jun 2005 08 Jun 2005 12 Jul 2005 0.03 Tunai
24 Dec 2004 29 Oct 2004 24 Jan 2005 0.14 Tunai
11 Jun 2004 21 May 2004 07 Jul 2004 0.03 Tunai
26 Dec 2003 11 Nov 2003 26 Jan 2004 0.078 Tunai
06 Jun 2003 13 May 2003 01 Jul 2003 0.03 Tunai
27 Dec 2002 04 Dec 2002 27 Jan 2003 0.06 Tunai
07 Jun 2002 14 May 2002 03 Jul 2002 0.03 Tunai
21 Dec 2001 29 Oct 2001 16 Jan 2002 0.043 Tunai
Papar semua

Hasil Dividen Tahunan

Tahun Dividen Tahunan ($) Kekerapan/Tahun Hasil %
2025 0.260 1 1.98
2024 0.530 2 3.55
2023 0.440 2 4.38
2022 0.380 2 3.95
2021 0.800 3 8.57
2020 0.920 3 8.83
2019 0.530 2 4.00
2018 0.517 2 3.80
2017 0.610 2 4.00
2016 0.320 2 2.30
2015 0.290 2 2.18
2014 0.290 2 2.10
2013 0.250 2 2.20
2012 0.201 2 2.90
2011 0.045 1 0.76
2010 0.260 2 3.88
2009 0.163 2 2.43
2008 0.363 3 7.26
2007 0.340 3 4.43
2006 0.120 1 1.38
Papar semua
13.9113.9113.4613.4613.0213.0212.5712.5712.1212.12Mar 26Mar 26Mar 27Mar 27Mar 28Mar 28Apr 2Apr 2Apr 3Apr 3Apr 4Apr 4Apr 7Apr 7Apr 8Apr 8

Tahap sokongan, rintangan dan garis aliran yang dibentangkan telah dihasilkan oleh model kecerdasan buatan (AI) dan harus ditafsirkan dengan berhati-hati.

10010075755050252500RSI (14H)
0.0000.000-0.020-0.020-0.040-0.040-0.060-0.060-0.080-0.080MACD (12, 26, 9)

Portfolio

AI Templat

Peringatan harga anda

Profil Risiko

| | | | |
Konservatif
Sederhana Konservatif
Sederhana
Sederhana Agresif
Agresif
Margin Keselamatan (EP)
Keuntungan Separa (TP1)
Keuntungan Sasaran (TP2)
Kerugian Maksimum (SL)

Penafian: Perkara di atas adalah untuk tujuan ilustrasi sahaja dan BUKAN nasihat pelaburan. Dapatkan nasihat daripada penasihat kewangan yang berkelayakan.

Harga Masuk (EP)

Ambil Untung 1 (TP1)

Ambil Untung 2 (TP2)

Henti Rugi (SL)

Julat 52 Minggu
 
52WL
 
52WH
SL
EP
TP1
TP2

Semua harga peringatan berada dalam julat harga 52 minggu

Keuntungan Nyata -
Keuntungan Tidak Nyata -
Dividen Diterima 2025 -
Jumlah Untung -
Pulangan Purata -
Kuantiti (Beli) -
Purata Harga (Beli) -
Kuantiti (Jual) -
Purata Harga (Jual) -
Tiada saham yang memenuhi kriteria anda