SUNWAY CONSTRUCTION GROUP BERHAD

KLSE: 5263 (SUNCON)

Kemas kini terakhir: 16 jam lalu

7.75

0.07 (0.91%)

Penutupan Terdahulu 7.68
Jumlah Dagangan 4,009,800
Harga / Pendapatan (P/E Ke hadapan) 20.05
Harga / Jualan (P/S) 2.23
Harga / Buku (P/B) 16.51
Julat 52 Minggu
5.49 (-29%) — 8.40 (8%)
Hasil Dividen (DY TTM) 8.39%
Margin Keuntungan 5.33%
Margin Operasi (TTM) 7.82%
EPS Cair (TTM) 0.180
Pertumbuhan Hasil Suku Tahunan (YOY) 131.60%
Pertumbuhan Pendapatan Suku Tahunan (YOY) 133.70%
Jumlah Hutang/Ekuiti (D/E MRQ) 66.81%
Nisbah Semasa (MRQ) 1.14
Aliran Tunai Operasi (OCF TTM) 1.27 B
Aliran Tunai Bebas Leveraj (LFCF TTM) 1.17 B
Pulangan Atas Aset (ROA TTM) 5.59%
Pulangan Atas Ekuiti (ROE TTM) 25.42%

Arah Aliran Pasaran

Jangka Pendek Jangka Sederhana
Industri Engineering & Construction (MY) Menaik Menaik
Engineering & Construction (Global) Menaik Menaik
Stok SUNCON Menaik Menaik

AISkor Stockmoo

0.4
Konsensus Penganalisis 4.4
Aktiviti Orang Dalam 1.0
Volatiliti Harga -0.6
Purata Bergerak Teknikal 0.0
Osilator Teknikal 4.0
Penilaian Relatif -1.7
Kesihatan Kewangan 1.4
Persekitaran Makro -0.3
AI Insight -5.0
AI Technical NA
Purata 0.42

Saham Serupa

Stok Modal Pasaran DY P/E (TTM) P/B
SUNCON - 8.39% - 16.51
GAMUDA - 2.08% - 2.30
KGB - 1.76% - 9.56
NICE - - - -
MNHLDG - 0.04% - 6.77
ICENTS - - - 8.41

Sunway Construction Group Bhd is a construction company. It provides design and construction services including building, civil engineering, infrastructure, mechanical, electrical, and plumbing (MEP) services and supply and installation of pre-cast concrete products. Its operations cover Malaysia, Singapore, the Middle East, and India. The operating segments of the company are Construction and Precast concrete. The maximum revenue is generated from the Construction segment. Geographically, the company operates in Malaysia, Singapore, India, Trinidad & Tobago, and United Arab Emirates.

Sektor Industrials
Industri Engineering & Construction
Gaya Pelaburan Mid Core
% Dimiliki oleh Orang Dalam 65.21%
% Dimiliki oleh Institusi 21.72%

Pemilikan

Nama Tarikh Syer Dipegang
Sunway Holdings Sdn. Bhd. 01 Apr 2022 703,530,000 (54.42%)
Julat 52 Minggu
5.49 (-29%) — 8.40 (8%)
Julat Harga Sasaran
8.52 (9%) — 10.70 (38%)
Tinggi 10.70 (RHB-OSK, 38.07%) Beli
Median 9.41 (21.42%)
Rendah 8.52 (TA, 9.94%) Pegang
Purata 9.54 (23.10%)
Jumlah 5 Beli, 1 Pegang
Harga Purata @ Panggilan 7.72
Syarikat Tarikh Harga Sasaran Panggilan Harga @ Panggilan
RHB-OSK 12 Oct 2026 10.70 (38.06%) Beli 7.62
06 Oct 2026 10.07 (29.94%) Beli 7.50
PHILLIP CAPITAL 24 Sep 2026 9.32 (20.26%) Beli 7.57
26 Aug 2026 9.32 (20.26%) Beli 8.00
AmInvest 17 Sep 2026 9.50 (22.58%) Beli 7.12
26 Aug 2026 9.50 (22.58%) Beli 8.00
HLG 26 Aug 2026 9.10 (17.42%) Beli 8.00
24 Aug 2026 9.10 (17.42%) Beli 8.08
RHB 26 Aug 2026 10.07 (29.94%) Beli 8.00
24 Aug 2026 10.07 (29.94%) Beli 8.08
TA 26 Aug 2026 8.52 (9.94%) Pegang 8.00
24 Aug 2026 8.52 (9.94%) Pegang 8.08
Papar semua
Nama Purata Belian ($) Purata Jualan ($) Jumlah Net Jumlah Nilai Bersih ($)
EMPLOYEES PROVIDENT FUND BOARD 7.55 7.55 1,904,300 14,377,465
Jumlah Keseluruhan Kuantiti Bersih 1,904,300
Jumlah Keseluruhan Nilai Bersih ($) 14,377,465
Purata Pembelian Keseluruhan ($) 7.55
Purata Jualan Keseluruhan ($) 7.55
Nama Pemegang Tarikh Jenis Kuantiti Harga Nilai ($)
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 23 Oct 2026 Dibuang (-) 2,037,000 7.55 15,379,350
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 23 Oct 2026 Diperolehi (+) 2,062,600 7.55 15,572,630
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 23 Oct 2026 Diperolehi (+) 860,300 7.55 6,495,265
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 23 Oct 2026 Diperolehi (+) 710,000 7.55 5,360,500
EMPLOYEES PROVIDENT FUND BOARD Pemegang Saham Besar 23 Oct 2026 Diperolehi (+) 308,400 7.55 2,328,420
Tarikh Jenis Butiran
05 Oct 2026 TheEdge Built for growth
05 Oct 2026 TheEdge Building resilience in an age of disruption
05 Oct 2026 TheEdge An evening of corporate excellence
05 Oct 2026 TheEdge Building community trust and outreach
05 Oct 2026 TheEdge Institutionalising excellence
05 Oct 2026 TheEdge Doing what matters, touching lives
30 Sep 2026 TheEdge Opinion: Malaysia can lead Asean on sustainable buildings — if it scales what already works
29 Sep 2026 TheEdge Gamuda's annual net profit tops RM1b for second straight year, order book hits RM61b
28 Sep 2026 TheEdge Higher dividends offer some relief in a volatile market
28 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
25 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
23 Sep 2026 TheEdge Sunway Construction crowned Company of the Year at The Edge BRC awards, PETRONAS honoured for nation building    
23 Sep 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
23 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
22 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
21 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Sep 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
18 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
17 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
15 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Sep 2026 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
14 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
11 Sep 2026 TheEdge Construction, utilities, consumer sectors set to benefit from Budget 2027, MBSB says
11 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Sep 2026 TheEdge Sunway Construction could bag RM1b mixed-use development contracts near Bukit Chagar — Maybank IB
09 Sep 2026 Pengumuman SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - CHANGE OF SHARE REGISTRAR'S NAME AND CONTACT DETAILS
09 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
08 Sep 2026 TheEdge Brokers Digest: Local Equities - Sunway Construction Group Bhd, Sime Darby Property Bhd, Aeon Co (M) Bhd, Matrix Concepts Holdings Bhd
08 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
07 Sep 2026 TheEdge A closer look at six potential entrants to the expanded KLCI
07 Sep 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
07 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
04 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
03 Sep 2026 TheEdge Kerjaya Prospek bags first data centre contract worth RM858 mil
03 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
02 Sep 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
02 Sep 2026 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
02 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
01 Sep 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
31 Aug 2026 TheEdge Gamuda’s growth story faces test on cash flow and execution
28 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
28 Aug 2026 Pengumuman DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
27 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
26 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
26 Aug 2026 Pengumuman SUNCON - Notice of Book Closure
26 Aug 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
25 Aug 2026 TheEdge Sunway Construction raises 2026 job win target, Maybank keeps ‘buy’ call
24 Aug 2026 TheEdge Sunway Construction 2Q net profit up 24% despite lower revenue
24 Aug 2026 TheEdge KLK, Batu Kawan, Khee San, Foodie Media, Sime Darby Property, WCE Holdings, Sunway Construction, Zetrix AI, Guan Chong, Cahya Mata Sarawak, Ajinomoto, Pestec
24 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
24 Aug 2026 Pengumuman Quarterly rpt on consolidated results for the financial period ended 30/06/2026
24 Aug 2026 Pengumuman SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") - MEDIA RELEASE OF THE FINANCIAL RESULTS FOR THE SECOND QUARTER ENDED 30 JUNE 2026
24 Aug 2026 Pengumuman Second Interim Dividend
24 Aug 2026 Pengumuman SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON") - DISCLOSURE IN RELATION TO ANY AGREEMENT, ARRANGEMENT, JOINT VENTURE OR COLLABORATION FOR THE PURPOSE OF BIDDING FOR OR SECURING A PROJECT OR CONTRACT (COLLECTIVELY KNOWN AS "VENTURES")
21 Aug 2026 TheEdge Sunway Construction bags RM1.04b engineering work contracts from US tech firm
21 Aug 2026 TheEdge Bank Islam, KPJ, Khee San, Bintulu Port, Sunway Construction, FBG, AEON Co, Allianz, Malaysia Marine and Heavy Engineering, Velesto, PA Resources, Far East, NationGate, Cuckoo
21 Aug 2026 TheEdge Analysts see tech, construction benefitting from KLCI expansion
21 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
21 Aug 2026 Pengumuman SUNWAY CONSTRUCTION GROUP BERHAD ("SUNCON" OR THE "COMPANY") - AWARD OF WORK ORDERS FOR THE PROVISION OF MECHANICAL, ELECTRICAL AND PLUMPING FIT OUT WORKS BY A MULTINATIONAL TECHNOLOGY COMPANY
20 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
19 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
18 Aug 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
18 Aug 2026 TheEdge Brokers Digest: Local Equities - Malayan Banking Bhd, Fraser & Neave Holdings Bhd, Hartalega Holdings Bhd, Sunway Construction Group Bhd
17 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
14 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
13 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
12 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
11 Aug 2026 Pengumuman WINDING UP / RECEIVER & MANAGER / RESTRAINING ORDER / SPECIAL ADMINISTRATOR
11 Aug 2026 Pengumuman Additional Listing Announcement /Subdivision of Shares
10 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
10 Aug 2026 TheEdge End of an era and start of a new phase at IJM
07 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
06 Aug 2026 Pengumuman Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - EMPLOYEES PROVIDENT FUND BOARD
Papar semua
Hasil Dividen (DY TTM) 8.39%
Purata Hasil Dividen 5T 3.11%
Nisbah Pembayaran 47.62%
Jangkaan Pembayaran Dividen Seterusnya Jan 2027
Tarikh EX Tarikh Pengumuman Tarikh Pembayaran Perincian
14 Sep 2026 24 Aug 2026 30 Sep 2026 0.04 Tunai
09 Jun 2026 18 May 2026 25 Jun 2026 0.152 Tunai
09 Jun 2026 18 May 2026 25 Jun 2026 0.076 Tunai
16 Mar 2026 23 Feb 2026 31 Mar 2026 0.09 Tunai
17 Dec 2025 20 Nov 2025 08 Jan 2026 0.23 Tunai
09 Dec 2025 20 Nov 2025 23 Dec 2025 0.0625 Tunai
10 Sep 2025 21 Aug 2025 25 Sep 2025 0.0725 Tunai
09 Jun 2025 20 May 2025 25 Jun 2025 0.05 Tunai
13 Mar 2025 20 Feb 2025 10 Apr 2025 0.025 Tunai
10 Dec 2024 21 Nov 2024 26 Dec 2024 0.025 Tunai
11 Sep 2024 22 Aug 2024 26 Sep 2024 0.035 Tunai
14 Mar 2024 20 Feb 2024 09 Apr 2024 0.03 Tunai
11 Sep 2023 23 Aug 2023 27 Sep 2023 0.03 Tunai
14 Mar 2023 21 Feb 2023 06 Apr 2023 0.025 Tunai
12 Sep 2022 23 Aug 2022 29 Sep 2022 0.03 Tunai
14 Mar 2022 23 Feb 2022 07 Apr 2022 0.04 Tunai
09 Sep 2021 19 Aug 2021 29 Sep 2021 0.0125 Tunai
12 Mar 2021 23 Feb 2021 07 Apr 2021 0.0275 Tunai
09 Sep 2020 18 Aug 2020 24 Sep 2020 0.0125 Tunai
12 Mar 2020 20 Feb 2020 08 Apr 2020 0.035 Tunai
12 Sep 2019 19 Aug 2019 26 Sep 2019 0.035 Tunai
20 Mar 2019 25 Feb 2019 17 Apr 2019 0.035 Tunai
05 Sep 2018 16 Aug 2018 27 Sep 2018 0.035 Tunai
21 Mar 2018 26 Feb 2018 19 Apr 2018 0.04 Tunai
14 Sep 2017 29 Aug 2017 28 Sep 2017 0.03 Tunai
21 Mar 2017 08 Mar 2017 20 Apr 2017 0.025 Tunai
15 Sep 2016 01 Sep 2016 29 Sep 2016 0.025 Tunai
23 Mar 2016 10 Mar 2016 21 Apr 2016 First Interim Dividend
Papar semua

Hasil Dividen Tahunan

Tahun Dividen Tahunan ($) Kekerapan/Tahun Hasil %
2026 0.588 5 7.59
2025 0.210 4 3.71
2024 0.090 3 1.94
2023 0.055 2 2.84
2022 0.070 2 4.49
2021 0.040 2 2.56
2020 0.048 2 2.53
2019 0.070 2 3.67
2018 0.075 2 5.64
2017 0.055 2 2.19
2016 0.025 2 1.47
Papar semua

Portfolio

AI Templat

Peringatan harga anda

Profil Risiko

| | | | |
Konservatif
Sederhana Konservatif
Sederhana
Sederhana Agresif
Agresif
Margin Keselamatan (EP)
Keuntungan Separa (TP1)
Keuntungan Sasaran (TP2)
Kerugian Maksimum (SL)

Penafian: Perkara di atas adalah untuk tujuan ilustrasi sahaja dan BUKAN nasihat pelaburan. Dapatkan nasihat daripada penasihat kewangan yang berkelayakan.

Harga Masuk (EP)

Ambil Untung 1 (TP1)

Ambil Untung 2 (TP2)

Henti Rugi (SL)

Julat 52 Minggu
 
52WL
 
52WH
SL
EP
TP1
TP2

Semua harga peringatan berada dalam julat harga 52 minggu

Keuntungan Nyata -
Keuntungan Tidak Nyata -
Dividen Diterima 2026 -
Jumlah Untung -
Pulangan Purata -
Kuantiti (Beli) -
Purata Harga (Beli) -
Kuantiti (Jual) -
Purata Harga (Jual) -
Tiada saham yang memenuhi kriteria anda